4500.  Two of them.  Except the new mega-ups wont be in fo ra few days so I cant run them both at the same time and im waiting to see fi the server room AC will be able to handl eth extra heat while watching to see if the raised floor will withstand the weight of the ups and i get bitching about having to shut down the library servers for a few hours (you wanna try moving full fucking rack and a half of equipment rollign around the freakin building ass) and the building air conditioner is down for weeks and it is already hot and stuffy in here because there is no air circulation AT ALL and no windows open in the marvel of 1972 Atomic Age architecture. 